July 2008

Time Capsule

3

With the floor open and some critical wiring exposed it was natural to detour our plans and re-wire the ceiling fan in the room below. When that sub-project was done it was time to button up the floor with a fresh sheet of 5/8″ plywood. I couldn’t resist the opportunity to leave some hidden treasure…in

Golden Rays

3

                Looking at this photo of migrating Golden Rays published in the Telegraph, I can’t help but feel that there is more driving our planet than random happenstance.

Open-Beam Flooring

Once you commit yourself to a certain level of perfection in a project you find yourself captive to forces beyond your control. This is what happened when I pulled up the carpet in Norah’s room. There was a soft spot between two sheets of plywood. It looked as if someone had dropped an 18 lb.

And How’s YOUR Weekend Shaping Up?

4

I want to be at 24,000 words today with my shitty first draft But of course I have to finish the flooring, molding, touch-up spackle and painting of the writer’s lair. But since we have the dumpster only until Monday morning, what I really need to be doing is pulling up carpet in the entire upper

Progress Report

2

How is the novel coming? Thanks for asking. IT SUCKS. Of course the most important part of any good writing is the writer’s lair. Which means that I have to install laminate flooring. On the entire upper floor…because once you’ve done one room you really kind of have to do all the rest of the